AUGMENTATION OF LHC STORAGE FACILITY AT GAIL VIJAIPUR, MADHYA PRADESH

LOCATION: GAIL, VIJAIPUR, MADHYA PRADESH

DESCRIPTION: GAIL (lndia) limited, a Maharathna PSU and India’s flagship Natural Gas Company is integrating all aspects of the Natural Gas value chain (including Exploration & Production, Processing, Transmission, Distribution and Marketing) and its related services.

Gail India Limited, Vijaipur, producing LHC (LPG, PENTANE & NAPHTHA) products. For storage of these products different storage facilities are available. Gail, Vijaipur, desires to construct Excess Storage Vessels for Augmentation of LHC Storage facility.

GAIL-VIJAIPUR needs M/s UPCEM Engineering and consultancy for Adequacy check and Augmentation of LHC storage facility (Mounded bullets for LPG and Propane, above ground bullets for Pentane and Tank for Naphtha) as per Area available in site as well as considering standard guidelines/practices of OISD/MOPNG, SMPV rules, PESO/CCoE Rules, MB Lal Committee Recommendations and along with Other Standard Engineering Practices

Sr. No. Product Type of Storage No’s Licensed Capacity per storage (MT)
1 LPG Mounded bullet 3 3208
2 PENTANE AG Bullet 1 448.56
3 NAPHTHA Tank 1 703.56

 

UPCEM Scope:

  • Feasibility Study of LHC Storage facility
  • Design basis of LHC storage facility
  • Preparation of PBD, PFD, and P&ID of respective storage facility
  • Preparation of Piping Layout
  • Preparation of Equipment’s and Instruments Datasheets
  • Adequacy Checks for Utilities, Fire Water and Flare System
  • Preparation of SLD, Motor Load List along with other Electrical Scope Documents
  • Study Of Cathodic Protection System for Mounded Bullets
  • Cost Estimation of Augmented storage facility
  • HAZOP Study of Augmented Storage facility
  • HAZID Study of Augmented Storage facility
  • QRA Study of Augmented Storage facility